Project Size Portfolio

Sukut’s Public Works Team has pursued and completed projects from $1 million to $100 million in value and continues to grow in size, scope, and geographically.

Avenues Septic to Sewer Conversion Packages 1 & 2

Avenues Septic to Sewer Conversion Packages 1 & 2


Sukut Construction is spearheading the conversion of more than 200 residential properties from septic sewage systems to a centralized live sewer network. This project features the installations of 15,000 linear feet of gravity sewer mainline within the public right-of-way. Sukut [...]



Read More

Great Park Framework Plan Improvements 


Sukut Construction is performing underground utility and roadway improvements for a new loop road within the Irvine Great Park development. The project includes installation of more than 18,000 linear feet of storm drain pipe, nearly 9,000 linear feet of sanitary [...]



Read More
Great Park Framework Plan Improvements 
Mid-Canal Storage Project

Mid-Canal Storage Project


Sukut is creating three new reservoirs for water storage management by widening the existing live Coachella Canal. This canal serves as a crucial artery, channeling water from the Colorado River to support agricultural activities in the Imperial and Coachella Valleys. [...]



Read More

Caltrans Route 189 Emergency Work Project


This project involved the emergency closure of CA-189 to perform remediation and excavation to remove and replace a failed gabion wall. Sukut replaced the failed gabion wall, utilizing rock baskets and Tensar geogrid. This restored the retention of the road [...]



Read More
Caltrans Route 189 Emergency Work Project
Canal Replacement Project, Segment 5B

Canal Replacement Project, Segment 5B


On this project, Sukut crews unwatered the existing canal and then removed, hauled, and disposed of collected sediment. Sukut also installed 165 dewatering wells to lower the water table to an approximate elevation of negative 18 feet to install 6,394 [...]



Read More

Bouldin Island Levee Improvement Project


This project reconstructed approximately five miles of the Bouldin Island Levee, bordering the Mokelumne River in the California Delta. These improvements aimed to increase the height of the levee to accommodate higher water levels in the delta. This project involved [...]



Read More
Bouldin Island Levee Improvement Project
Caltrans 07-343204 I-405 Slope Repairs at Rinaldi Street Project

Caltrans 07-343204 I-405 Slope Repairs at Rinaldi Street Project


Since its original construction, the slopes along Interstate 405 between Rinaldi Street and the interchange with Interstate 5 have eroded significantly, posing a threat to the traveling public's safety. To remedy the hazard, Sukut regraded the slopes, removing the old [...]



Read More

Caltrans 07-339604 Route 14 Slope Repair Project


Sukut will reconstruct a 2,000-foot-long cut slope that was graded during the construction of State Route 14 in the early 1970s. Over the years, the hill, which reaches a height of nearly 200 feet, has experienced tremendous erosion. Approximately 212,000 [...]



Read More
Caltrans 07-339604 Route 14 Slope Repair Project
Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project

Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project


Sukut installed 14 different drainage system improvements along State Route 18 from the City of San Bernadino up to the intersection with State Route 138. This mountainous section has elevations starting at 1,400 feet and ending at 4,400 feet, with [...]



Read More

Pure Water Program Morena Conveyance System Project


Sukut is installing two separate pipelines, each nearly seven miles in length. The pipelines are part of the City of San Diego’s massive Pure Water program. Once operational, the project will purify 30 million gallons of recycled water per day [...]



Read More
Pure Water Program Morena Conveyance System Project
SR-46 SLO Corridor Improvements Project

SR-46 SLO Corridor Improvements Project


Sukut performed construction activities to widen the Cholame Section of Route 46 from a two-lane highway to a four-lane divided expressway. This 200-acre section extends from Post Mile 49.7 to 54.7, totaling five miles from end to end. The project’s [...]



Read More

State Route 4 Wagon Trail Realignment, Phase 1 Project


This project reconstructed approximately three miles of State Route 4 in Calaveras County, east of Copperopolis, CA, Sukut modified the roadway’s existing horizontal and vertical curves, widening the shoulders, and adding turnouts. The purpose of these improvements was to reduce [...]



Read More
State Route 4 Wagon Trail Realignment, Phase 1 Project
North Indio Flood Control Phase 2 Project

North Indio Flood Control Phase 2 Project


Sukut constructed 16,000 linear feet of a flood control channel, with over 100,000 cubic yards of concrete placement and more than one million cubic yards of excavation. The new channel crosses six existing public streets and requires the construction of [...]



Read More

Palm Springs MDP Line 41 Stage 3 and 4 Project


On this project, Sukut constructed approximately 6,000 linear feet of underground reinforced concrete pipe storm drain ranging in sizes from 18 to 108 inches and a six-acre detention basin with 220,000 cubic yards of export. The storm drain line required [...]



Read More
Palm Springs MDP Line 41 Stage 3 and 4 Project
Walteria Retention Basin Improvements Phase 1 Project

Walteria Retention Basin Improvements Phase 1 Project


This project involved pump station upgrades, channel repairs, basin improvements, and the performance of other appurtenant work. Additionally, Sukut performed access road improvements, erosion stabilization, and installed landscaping and irrigation systems.



Read More

Oasis In-Lieu Recharge Phase II Project


Sukut constructed approximately 17.5 miles of pipelines of various diameters, ranging from 66 down to eight inches.  The project also included constructing four pump stations with furnishings and the installation of 15 vertical turbine pumps up to 300 horsepower and [...]



Read More
Oasis In-Lieu Recharge Phase II Project
L-4 Pump Station Relocation, Phase II Project

L-4 Pump Station Relocation, Phase II Project


Working for Coachella Valley Water District, Sukut is relocating the L-4 Pump Station east from its current location to a point on the north side of the All American Canal, just west of Jefferson Street in the city of La [...]



Read More

Lakewood Stormwater Capture at Mayfair Park Project


This stormwater harvesting and underground storage system at Mayfair Park required the excavation of 92,700 cubic yards of earth and the export of 35,000 cubic yards of material. The placement of the shoring beam and plate, along with the installation [...]



Read More
Lakewood Stormwater Capture at Mayfair Park Project
San Pasqual Undergrounding Project

San Pasqual Undergrounding Project


Sukut removed, relocated, and replaced approximately two and a half miles of the Escondido Canal that crosses through the San Pasqual Indian Reservation. The three major components to accomplish this included: desilting basin construction, demolition and replacement of existing canal [...]



Read More

Lower Elkhorn Interior Drainage Project


Sacramento Area Flood Control Agency contracted Sukut to construct a 750,000-cubic yard detention basin. During the project, Sukut performed 250 acres of clearing, grubbing, and stripping of topsoil and native vegetation, as well as constructing a new 7.5-mile-long channel and [...]



Read More
Lower Elkhorn Interior Drainage Project
CalTrans Highway 29 Project

CalTrans Highway 29 Project


Sukut completed this three-mile-long highway realignment project that included over 400,000 cubic yards of roadway excavation, roughly 420,000 cubic yards of rock excavation, and 40,000 cubic yards of controlled blasting. In total, Sukut moved nearly 900,000 cubic yards of rock [...]



Read More

Cajon Air Center – Aircraft Transient Apron Project


This project of building a transient aircraft apron connecting to existing taxiways at El Cajon Gillespie Field Airport consisted of underground pipework, grading, asphalt paving, curb and gutter, and dewatering.



Read More
Cajon Air Center – Aircraft Transient Apron Project
Oasis In-Lieu Recharge Project

Oasis In-Lieu Recharge Project


The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch steel pipeline, the Oasis Tower bypass system, irrigation lateral 97.1 Tie-In, and a reinforced concrete control structure that includes pumps, motors, valves, couplings and appurtenances. The work [...]



Read More

Cajon Air Center Drainage Project


On this project, Sukut installed approximately 3,000 feet of concrete pipe in the location of the existing earthen swale used for stormwater conveyance, and 820 feet of an additional RCB from the center of the new concrete pipe, connecting to [...]



Read More
Cajon Air Center Drainage Project
Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project


The project included the installation of approximately 40 miles of gravity and force main sewer lines ranging in size from 4 to 15 inches. The project also required removing and replacing 28 miles of paved roads with over 90,000 tons [...]



Read More

Canyon Country Community Center Project


On this project, Sukut performed the following work: clear and grub, demolition of an existing concrete channel, rough grading, HDPE storm drain, installation of a temporary detention basin, construction of a temporary diversion channel, water treatment facility, fencing, RCP, double [...]



Read More
Canyon Country Community Center Project
West Fontana Channel Project

West Fontana Channel Project


This project for San Bernardino County Public Works included the construction of a three-mile-long reinforced concrete rectangular channel, with adjacent asphalt paving work, pre-cast reinforced concrete box culverts, piping, installation of chain link fencing and gates, relocation of street lights, [...]



Read More

La Novia Roundabout Project


The La Novia Roundabout Project was designed to improve traffic flow by reconfiguring the existing stop-controlled intersection. The new system allows drivers to follow La Novia Avenue, or to take Valle Road going North or South.  Sukut performed construction services on this [...]



Read More
La Novia Roundabout Project
Hi-Desert Water District Barron Pump Station

Hi-Desert Water District Barron Pump Station


The work included site clearing and grubbing, trenching, shoring, excavation, backfill, and compaction.  Additionally, the scope included the installation of the pump station and associated control equipment. A flow meter vault was constructed, as well as a diversion structure, manhole, [...]



Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project


The scope of work consisted of the installation of 20,400 linear feet of DIP and 40,800 linear feet of fiber optic communication. The project also included two lift stations along with booster pumps, electrical power, control panels, communication electronics, pumps, [...]



Read More
CSA 70, Zone W4 – Pioneertown Pipeline Project
Clinton Keith Road Construction Phase 2

Clinton Keith Road Construction Phase 2


Sukut completed new road construction on Clinton Keith Road Construction. The project highlights included: 500,000 cubic yards of dirt and rock excavation 91,000 cubic yards of rock blasting 10,000 linear feet of RCP storm drain Two retaining walls One cast-in-place [...]



Read More

Cajon Air Center Underground Detention Basin


This project entailed excavating down and installing a two-acre underground water storage reservoir capable of holding approximately 12 acre-feet of water. The project highlights included: Onsite contaminated groundwater required a water treatment system for dewatering operation Placed 3,600 cubic yards [...]



Read More
Cajon Air Center Underground Detention Basin
La Pata Avenue – Schedule C

La Pata Avenue – Schedule C


This project entailed constructing a new half-a-mile-long road, connecting Camino Del Rio to Avenida la Pata in San Clemente. The project highlights included: Accelerated and completed three months ahead of schedule New roadway construction ½ mile connecting Avenida La Pata [...]



Read More

Industry Business Center West Side Grading Phase 2


This project entailed grading 250 acres, excavation of native unstable soil, and replacing it with engineered, compacted fill.  Additionally, the scope included the installation of a storm drain system, as well as the construction of a few structures.  Sukut has [...]



Read More
Industry Business Center West Side Grading Phase 2
La Pata Avenue Gap Closure Project – Schedule B

La Pata Avenue Gap Closure Project – Schedule B


Sukut was performing construction services on the La Pata project that included a one-mile three-to-five-lane roadway widening from Stallion Ridge to Ortega Highway. The project was completed three months ahead of schedule, with value-engineered asphalt removal and installation.



Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4


This flood control project consisted of dewatering, excavation, and the construction of over 10,000 lineal feet of concrete reinforced channel.



Read More
Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4
Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C


The project was adjacent next to another Hi-Desert Water District project, also executed by Sukut. The scope consisted of constructing over 32 miles of gravity sewer pipeline and 422 polymer manholes. The pipes ranged in size from 6” to 21”, [...]



Read More

Clinton Keith Road Phase 4 Project


This road project included roadway and rock excavation for widening areas of over 17,000 cubic yards, decomposed granite trail of more than 100,000 square feet, various minor concrete structures, and nearly 17,000 tons of asphalt paving. This project was constructed [...]



Read More
Clinton Keith Road Phase 4 Project
Port of Los Angeles

Port of Los Angeles


Prime contractor Sukut Construction performed grading and demo operations in front of the ongoing erection of Reefer Racks – the red steel structures in the backdrop — inside an active Port of Los Angeles shipping terminal. The scope of work [...]



Read More

Riverside Drive


A long, deep vertical cut was needed to install a storm drain pipe near dairy farms. Rather than utilizing an excavator, Sukut used scrapers to excavate the ground. This created a large pipe excavation zone that greatly increased production. This [...]



Read More
Riverside Drive
Eastern Corridor 241-261 – Toll Road

Eastern Corridor 241-261 – Toll Road


A design-built project consisting of 26 miles of new roadway including six lanes, with Sukut performing earthwork, drainage, and roadway construction, and FCI constructing bridges. Sukut moved 67 million cubic yards of earth through the rugged Santa Ana mountains, including [...]



Read More