Cajon Air Center Underground Detention Basin

Client:

County of San Diego, Department of Public Works


Date Completed:

April 15, 2017


Location:

El Cajon, CA


Description of Project:

This project entailed excavating down and installing a two-acre underground water storage reservoir capable of holding approximately 12 acre-feet of water. The project highlights included:

  • Onsite contaminated groundwater required a water treatment system for dewatering operation
  • Placed 3,600 cubic yards of concrete slab
  • Placed 734 individual precast concrete structures
  • 66,000 cubic yards of excavation
  • Meeting airport spec compaction for subgrade / base
  • Installing two acres of Mirafi Filter fabric