Sukut’s Environmental Services market does many different types of projects. These jobs vary from Landfill Expansion projects, both public and private, ranging from $1 million to $40 million, landfill closures, also ranging from $1 million to $30 million, disaster relief/debris cleanup projects from the State of California ranging from $1 million to $75 million.
Burbank Landfill No.3 – Phase IIIA Side Slope Liner Expansion
Sukut Construction is executing the site development and complex containment infrastructure for a 2.5-acre landfill cell expansion. Tasked with navigating steep side-slope topography, the team is performing 110,000 square feet of subgrade preparation and placing 800 cubic yards of low-permeability [...]
Read More
Mid-Valley Sanitary Landfill Unit 4 Phase 2 Composite Liner
Sukut Construction is constructing a new lined landfill cell spanning approximately 43 acres to support the continued expansion and operation of the facility. The project includes approximately 36,000 cubic yards of grading and placement of 192,000 cubic yards of low-permeability [...]
Read More
Toland Road Landfill Phase 4C Liner Expansion Project
Sukut excavated 1.1 million cubic yards of earth at the Toland Road Landfill Phase 4C Liner Expansion project in Santa Paula, CA. In addition to the excavation, Sukut installed 430,000 square feet of liner, 2,500 linear feet of LCRS pipe, [...]
Read More
El Sobrante Landfill Mine Reclamation and Cell 13B Excavation Project
The work is split up into two projects. The first project includes the excavation and stockpile for the future cell expansion of roughly 1,450,000 cubic yards with drainage installation on the stockpiles. The second project consists of the excavation of [...]
Read More
Badlands Sanitary Landfill, Phase 2 Stage 1 Liner Expansion Project
This project, on this 98-acre site, involved 3,000,000 cubic yards of excavation, 1,400,000 square feet of lined slopes and floor liner installation, import of clay, LCRS drainage rock placement, protective cover soil, surface drainage, and erosion control implementation.
Read More
Prima Deshecha Landfill, Infrastructure Phase 1A Project
Sukut is constructing additional on and off-ramps for Orange County Waste & Recycling to access their landfill off Avenida La Pata. In addition to this work, Sukut is constructing a 100,000-cubic-yard buttress and excavating an additional 130,000 cubic yards to [...]
Read More
Altamont Landfill FA2 Phases 6 and 7 Project
Sukut worked on this two-year contract that included two phases of cell development at Altamont Landfill in Livermore, CA. Phase 6 consisted of about 1.3 million cubic yards of excavation, which went to stockpiles, as well as engineered fill. Phase [...]
Read More
OAL Landfill Gas Header Upgrade Phase 1 Project
On this project, Sukut installed approximately 4,000 linear feet of 30-inch landfill gas header to upgrade the existing 18-inch header. This work included a temporary landfill gas jumper system to keep the existing landfill gas system operational during construction. The [...]
Read More
Frank R. Bowerman Landfill Phase VIII-A1 Groundwater Protection Project
Sukut completed over eight million cubic yards of earthwork for cell excavation, landslide remediation, and buttress fill placement. The project included installing 1.8 million square feet of geosynthetic liner, placing 25,000 tons of leachate collection gravel, and 55,000 linear feet [...]
Read More
Colton Sanitary Landfill Project
The project included the installation of four million square feet of 50 mil LLDPE geomembrane and closure turf, import of 140,000 cubic yards of soil, placement of 30,000 tons of aggregate base, paving 200,000 square feet of asphalt, drilling and [...]
Read More
FRB Landfill Sewer and Water Line Treatment System Design-Build Project
The primary objective of this project is to contain Frank R. Bowerman landfill odors from the storage and treatment tanks and eliminate any associated odors when discharging the treated effluent to the sewer or during on-site reuse application. In order [...]
Read More
Olinda Alpha Phase 1A Valencia Greenery Project
The project included the construction of a compost greenery at the Olinda Landfill in Brea, CA. The scope of work included mass grading, geosynthetic liner, HDPE and welded steel water line, installation of water storage tanks, concrete foundations and surface [...]
Read More
American Avenue Disposal Site Phase 1 Waste Relocation Project
The work consists of the relocation of buried wastes currently located within the Phase I area to the lined Phase II Waste Management unit of the project. The scope includes mass excavation and hauling of approximately 1,500,000 cubic yards of [...]
Read More
Disaster Debris Removal and Disposal Services Project
This project is for the on-call services to respond to any natural disaster, fire cleanup, etc. within Sonoma County. Sukut will be required to mobilize labor, equipment, and materials, within a specific timeframe, in response to any disasters that potentially [...]
Read More
Landers Sanitary Landfill Phase 1A Project
Sukut constructed the Phase 1A cell expansion of the Landers Landfill for San Bernardino County. The project included 275,000 cubic yards of excavation, 350,000 square feet of geosynthetic liner installation, 5,000 linear feet of leachate collection and landfill gas piping, [...]
Read More
Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project
Sukut performed landfill improvements by excavating roughly 600,000 cubic yards of soil and rock, which included blasting approximately 150,000 cubic yards. The team placed 40,000 cubic yards of a clay liner, imported 50,000 tons of LCRS and underdrain gravel, and [...]
Read More
Keller Canyon Cell Phase 2F Project
This seven-acre cell construction project involved the excavation of 100,000 cubic yards of soil and placement of engineered fill, 25,000 cubic yards of the low permeability clay liner, and the import of about 20,000 tons of pea gravel for the [...]
Read More
North County Landfill Area 6 Recycling Center and Sanitary Landfill Project
The project included 250,000 cubic yards of excavation to stockpile and fill, 450,000 square feet of foundation layer, 450,000 square feet of operations layer, 3,000 linear feet of HDPE pipe, 2,200 square feet of access roads, and drainage work.
Read More
Barstow Sanitary Landfill Liner 1B Project
This project included excavating 460,000 cubic yards of earth, installing 2,500 linear feet of LCRS piping, and placing 35,0000 tons of drainage gravel. Also included in the scope were clearing, demolition, new liner placement, finish, and hydro-seed work.
Read More
Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project
The project included the excavation of 170,000 cubic yards to stockpile and the placement of 10,000 cubic yards of imported clay liner soil for cell construction. Sukut also imported and placed 8,000 tons of leachate gravel and install 5,000 linear [...]
Read More
Vasco Road Landfill DU-13B Cell Construction 2022 Project
The project included excavation and stockpiling of 175,000 cubic yards of soil, placement of 3,000 cubic yards of clay soil liner, along with 4,000 tons of LCRS drainage gravel for the construction of the cell. Sukut also installed approximately 3,000 [...]
Read More
Antelope Valley Public Landfill Cell Phase V-B Project
This project for Waste Management consisted of 1.5 million cubic yards of excavation, finish, and storm drain-related items.
Read More
El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project
On this project, Sukut performed work that included excavation, fine grade, installation of clay, leachate piping and drainage gravel, liner installation, and operation layer placement.
Read More
Prima Deshecha Landfill Zone 4 Habitat Mitigation Project
Sukut performed drainage improvements at the Prima Deshecha Landfill which included grading 30,000 linear feet of drainage swales and planting of vegetation.
Read More
Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project
Sukut worked on the expansion of the groundwater protection liner system at Prima Deshecha Landfill. The project included the installation of 360,000 square feet of the geosynthetic liner, HDPE piping, and gravel for the leachate collection system, along with various [...]
Read More
Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project
Acting as a CMAR, Sukut made significant infrastructure upgrades to the entrance facilities and landfill gas flare system, as well as overall improvements of approximately nine acres of land within the landfill. This work included removing and replacing the existing [...]
Read More
El Sobrante Landfill Phase 13A Project
This project included clearing, excavating 4,500,000 cubic yards of material, heavy D11 ripping, drilling, and shooting rock, building basins, installing pipe to create the next cell for disposal, as well as finish and drainage work.
Read More
Altamont Landfill FA2 Phase 4 Project
This project included the excavation of 1,300,000 million cubic yards of soil to stockpile, with approximately 300,0000 cubic yards of blasted material. Work consisted of placing an underdrain gravel layer, earthfill layer, low permeability layer, LCRS gravel layer, and lastly, [...]
Read More
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut entered into a joint venture with Pacific States Environmental Contractors and P31 Enterprises (PSP JV) to begin the Northern Branch wildfire cleanups located in Butte, Lassen, Nevada, Plumas, Shasta, Del Norte, Siskiyou, Trinity, and Yuba Counties. Wildfires swept through [...]
Read More
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin Construction, P31 Enterprises, J. W. Bamford (SOPB) to remove and dispose of the dead and dying trees that were damaged by the Camp Fire. In total, 300,000 [...]
Read More
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involved over 10,000 cubic yards of excavation and engineered fill, as well as up to 5,000 cubic yards of refuse excavation. The fine grade/preparation and deployment of the liner took place on over 300,000 square feet of 1.5:1 [...]
Read More
Prima Capistrano Greenery Project
This project involved moving over 100,000 cubic yards of dirt and providing almost 100,000 square feet of HDPE liner. The project also had a number of site work items related to wet utilities, gas line piping, concrete work, landscaping, and [...]
Read More
FRB Bee Canyon Greenery Project
This project consisted of 740,000 cubic yards of earthwork, construction of a 784,000-square foot asphalt compost deck, a water supply system, a fire water system for Orange County Fire Authority, water tanks, lined stormwater basin, and miscellaneous civil improvements for [...]
Read More
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project was a 10-acre landfill closure that called out for the placement of a 4-foot cover on the existing slopes along with the installation of piping and finish. The second project [...]
Read More
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project included excavation of up to two million cubic yards of material, construction of a desilting basin, two engineered stockpiles, 17 acres of composite geo-membrane liner, storm water infrastructure, and a new paved haul road. The [...]
Read More
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project included the excavation of 1.4 million cubic yards of soil needed to construct a new cell for Waste Management. The scope of work also called out for underdrain and LCRS installation of about 10,000 linear feet of HDPE [...]
Read More
Chiquita Canyon Landfill C6 Liner Project
The project included the excavation of one million cubic yards of soil for the construction of a new cell for Waste Connections. Sukut constructed a ten-foot-wide by five-foot-deep rectangular channel, along with various other surface drainage improvements. The cell construction [...]
Read More
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the aftermath, Sukut was contracted to perform wildfire debris removal from over 850 properties impacted by the fire in Calaveras County.
Read More
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consisted of 700,000 cubic yards of material to be stockpiled, the construction of a liner, which included various layers: low permeability, sand, gravel, protective soil cover, along with the various geosynthetic layers in between. Additional installation [...]
Read More
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States Environmental Contractors, the SPSG Partners, to begin a one-year fire cleanup project in Butte County, CA. The Camp Fire went through Paradise, CA back in November 2018, destroying more than 153,000 [...]
Read More
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consisted of approximately 1.5 million cubic yards of excavation for a new cell expansion and a 31 AC landfill closure which included working in and around the existing landfill gas system and the installation of [...]
Read More
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project included the installation of 24-inch thick low permeability material, with a combination of both slope and floor over a 2.5-million square feet area. Additionally, the scope of work includes the construction of a leachate sump, pump system, LCRS [...]
Read More
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was entering into the waters of Clear Lake in Lake County. Special operations required a 50,000-pound excavator to be placed on a floating barge in order to remove debris, docks, [...]
Read More
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 Front Slope Improvement project for Orange County Waste and Recycling. Sukut displayed its wide capabilities with major earthwork components, landfill gas collection system modifications and improvements, waterline [...]
Read More
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency Services to perform post-debris removal work in Mendocino, Sonoma, and Napa County. Following the 2017 Wildfire Debris Removal efforts, lots were still in need of engineered backfill in order [...]
Read More
Santa Rosa/Napa Fire Debris Cleanup
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup Project located in Santa Rosa, CA. The project consisted of a fire response to clean up all debris that devastated Napa and Sonoma Counties.
Read More
Thomas Fire Project
At the beginning of 2018, Sukut was contracted by CalRecycle to perform the emergency cleanup of over 600 burned residential lots following the Thomas Fire, the biggest fire in the history of California. Sukut deployed 40 crews that occupied 140 trucks [...]
Read More
Detwiler Fire Debris Removal and Recovery
The project scope included the removal, storage, transportation, and disposal of hazardous and non-hazardous solid waste and debris resulting from the fire that burned in Mariposa County.
Read More
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consisted of the construction of a composite liner system including mass excavation, a subdrain and leachate collection system, a low-permeability soil layer, a drainage gravel layer, and importation and placement of operations layer and geosynthetics. The project also [...]
Read More
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth moving, material processing, clay placement, and an HDPE lining system. Landfill construction was in accordance with Subtitle D, a stringent quality assurance during construction. The following is a [...]
Read More
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in two locations at the project site. It included remedial work on stream-bed protection, gabion structures, concrete surface drainage structures, relocation of a timber bridge section and installation of a [...]
Read More
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to extinguish the nation’s longest burning tire fire. An ingenious combination of foam, water, and heavy equipment ingenuity made this task possible. All work was coordinated and managed by [...]