OAL Landfill Gas Header Upgrade Phase 1 Project

Client:

County of Orange, OC Public Works


Location:

Brea, CA


Description of Project:

On this project, Sukut installed approximately 4,000 linear feet of 30-inch landfill gas header to upgrade the existing 18-inch header. This work included a temporary landfill gas jumper system to keep the existing landfill gas system operational during construction. The project also involved the abandonment and installment of various existing landfill gas lines, butterfly valves, and tees. Lastly, Sukut also installed a 42-inch corrugated drainpipe, performed asphalt paving, and constructed concrete aprons and utility crossings.

CALL NOW