Project Size Portfolio

Sukut works on projects from $500 thousand to $500 million. With the largest grading fleet in California, Sukut is able to construct the largest jobs in the state, as well as being versatile enough to efficiently build smaller projects for our customers.

Gerber and Elder Creek Project

Gerber and Elder Creek Project


Sukut worked at the Gerber and Elder Creek project, a Lennar Homes development in Elk Grove, CA. Throughout the project, Sukut installed 7,600 linear feet of sewer mainline, which provided efficient waste management for the entire development. Sukut also implemented [...]



Read More

Rancho Mission Viejo (RMV) Tract 19227 Flood and Storm Drain Improvements Project


This project involved constructing a series of five water quality/infiltration basins in conjunction with mass excavation and the installation of sizeable storm drain structures and large RCPs up to 144 inches in diameter sizing.



Read More
Rancho Mission Viejo (RMV) Tract 19227 Flood and Storm Drain Improvements Project
Rancho Mission Viejo (RMV) 30-Inch CMLC Cow Camp and Gibby Road Project

Rancho Mission Viejo (RMV) 30-Inch CMLC Cow Camp and Gibby Road Project


Sukut is installing approximately 2,100 linear feet of backbone infrastructure 30-inch CMLC to connect the in-tract homeowner water infrastructure to the local reservoir dam water infrastructure.



Read More

San Juan Meadows Rough Grading and Storm Drain Project


On this project, Sukut preformed mass grading, partial landfill closure, storm drain, and a landfill gas collection system for the San Juan Meadows residential development. The project included two million cubic yards of grading, relocation of 275 thousand cubic yards [...]



Read More
San Juan Meadows Rough Grading and Storm Drain Project
The Terraces at Walnut Project

The Terraces at Walnut Project


Sukut performed the rough grading, including the excavation of 2.2 million cubic yards of earth, export, construction of 250,000 square feet of Verdura walls, and 22,000 linear feet of surface drainage improvements for the residential development. It houses 211 single-family [...]



Read More

Montebello Hills Grading Phases A and B Project


This project includes 3.7 million cubic yards of remedial grading and 5.6 million cubic yards of mass excavation for a 221 acre residential development in Montebello, CA.



Read More
Montebello Hills Grading Phases A and B Project
Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project

Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project


Sukut performed the remedial grading and mass excavation of this 34-acre site that now houses 74 single-family lots. In addition, the project included the construction of a cast-in-place vehicular bridge to provide access to the new community. Sukut also constructed [...]



Read More

Westlake Phase 2 Lake 2 Construction Project


As a general contractor on this project, Sukut oversaw the dewatering, shotcrete shoreline, and shoreline waterproofing of the existing 25-acre lake to be reworked into a 39.5-acre lake for future home development at the Westlake Villages community. Sukut self-performed the [...]



Read More
Westlake Phase 2 Lake 2 Construction Project
Rienda Zones A and 1 Tank Site and Pipelines Project

Rienda Zones A and 1 Tank Site and Pipelines Project


Sukut performed work that consisted of constructing the Rienda interim zones 1 and A, a tank site, and pipelines to service Planning Area 3 for RMV Realty. The work in the proposed domestic (zone 1) and reclaimed waterlines (zone A) [...]



Read More

San Marcos Highlands Grading Project


This residential rough grading project for KB Home involved earthmoving activities to prepare pads for approximately 200 homes. The scope included approximately one million cubic yards of earthwork, including rock excavation in the Jurassic Santiago Peak Volcanic Formation.



Read More
San Marcos Highlands Grading Project
The Highlands at Tesoro del Valle Project

The Highlands at Tesoro del Valle Project


This rough grading project is located on the 400-acre site and involved over 13 million cubic yards of excavation. The site will house a new residential development, The Highlands at Tesoro del Valle, for Newport Pacific Land.



Read More

Cow Camp Road Phase 2B and SMVD Improvements Project


The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho Mission Viejo, CA, was a new roadway construction that included underground sewer, CMLC, and PVC waterlines, RCP storm drain and structures, dry utilities, concrete curb and sidewalk, street [...]



Read More
Cow Camp Road Phase 2B and SMVD Improvements Project
Rancho Mission Viejo (RMV) PA 3.1 and CCR Rough Grading Project

Rancho Mission Viejo (RMV) PA 3.1 and CCR Rough Grading Project


Project included mass excavation of 3,000,000 cubic yards and nearly 2,000,000 cubic yards of remedial grading for the Cow Camp Road Phase 2B improvements and planning area 3.1 in Rancho Mission Viejo, CA.



Read More

FedEx Ontario Airport Expansion Project


On this project, Sukut handled 450,000 cubic yards of over-excavation and 2.1 million square feet of grading to prepare the site for a new FedEx-operated Cargo Facility at the Ontario Airport. The facility was built by Walsh Construction.



Read More
FedEx Ontario Airport Expansion Project
Hidden Canyon PA 18

Hidden Canyon PA 18


Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 luxury home sites for the client and land developer, Toll Brothers.  Utilizing two of the company’s CAT D11 dozers, Sukut was able to rip through 180,000 [...]



Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain


Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  Additionally installed were supporting structures such as inlets, head walls, and energy dissipator structures. In 2018, the project received the “Transporation Project of the Year” award presented [...]



Read More
Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Rolling Hills Country Club Grading and Storm Drain

Rolling Hills Country Club Grading and Storm Drain


This project involved the transforming of the existing golf course and adjacent quarry into a larger golf course with a new clubhouse and more than a 100 residential lots.  As a subcontractor, Sukut proposed and successfully installed vertical HDPE pipes, [...]



Read More

Porter Ranch Project


This hillside residential grading project was the last phase of the Porter Ranch development for Toll Brothers, Inc. It is located across the street from the first phase, which was also completed by Sukut.  This project included over 5,500,000 cubic [...]



Read More
Porter Ranch Project
Hyundai-Kia Proving Ground

Hyundai-Kia Proving Ground


Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia group. This construction consisted of 8,000 acres of land, the installation of 17,000 lineal feet of 16-inch waterline, and paving of 10 miles of access roads.



Read More

Harmony Grove Project


This rough grading project for Standard Pacific included 3,000,000 cubic yards of scraper excavation and 2,000,000 cubic yards of drilling, blasting, and rock excavation for future residential homes.



Read More
Harmony Grove Project
Crystal Cove

Crystal Cove


Sukut Construction, Inc. earned the American Society of Civil Engineers Project of the Year Award after moving 30 million cubic yards of earth and installing seven million square feet of geogrid soil reinforcement on the project.



Read More

Pelican Hill Golf Course and Resort


In 1990, Sukut Construction, Inc. built the world-renowned Pelican Hill golf course. In 2005, Sukut Construction, Inc. was asked by The Irvine Company to be part of its consulting team and serve as the general contractor for the challenging world-class [...]



Read More
Pelican Hill Golf Course and Resort
Headlands Reserve

Headlands Reserve


Located along Dana Point's coastline, the Headlands Reserve development is now home to custom residences and a hotel overlooking the Pacific Ocean. Sukut Construction, Inc. performed the project’s mass grading, concrete work, and rip rap revetment improvements at Strand Beach. [...]



Read More

Walnut Hills – Three Oaks Project


Sukut Construction, Inc. moved more than 17 million cubic yards of earth to create 268 mountaintop lots across 268 graded acres for this multi-million-dollar development. The company implemented innovative grading and reconstruction techniques to reshape mountainous terrain and create a [...]



Read More
Walnut Hills – Three Oaks Project
Dos Lagos 18 Hole Golf Course

Dos Lagos 18 Hole Golf Course


Sukut Construction, Inc. reclaimed the long-abandoned dumping ground site with an innovative design that restored safety to the aquifer and brought balance back to previously destroyed habitat areas. The company established two surface lakes for a 543-acre, mixed-use community. The [...]



Read More
CALL NOW