Mid Valley Landfill Unit 4 Ph 1 Liner Construction

Client:

San Bernardino Public Works


Total Value:

$27,728,663.00


Location:

Rialto, CA


Description of Project:

The project included the installation of 24-inch thick low permeability material, with a combination of both slope and floor over a 2.5-million square feet area. Additionally, the scope of work includes the construction of a leachate sump, pump system, LCRS storage containment area, and leachate loading/transfer system. Two stormwater basins will also be constructed to serve as the landfill’s stormwater runoff containment, along with miscellaneous civil and drainage improvements in the landfill.