Upper Chiquita Reservoir Slope Repair
Client:
Santa Margarita Water District
Location:
Ladera Ranch, CA
Description of Project:
Sukut performed repair services on the 1.5:1 slope that was damaged during rains in 2016. Scope included the installation of the geogrid and refinishing of slopes, repair of MSE walls, fence, and V-ditch.