Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project
Client:
Hi Desert Water District
Date Completed:
January 10, 2020
Location:
Yucca Valley, CA
Description of Project:
The project included the installation of approximately 40 miles of gravity and force main sewer lines ranging in size from 4 to 15 inches. The project also required removing and replacing 28 miles of paved roads with over 90,000 tons of asphalt.