Oasis In-Lieu Recharge Phase II Project

Client:

Coachella Valley Water District


Location:

Thermal, CA


Description of Project:

Sukut constructed approximately 17.5 miles of pipelines of various diameters, ranging from 66 down to eight inches.  The project also included constructing four pump stations with furnishings and the installation of 15 vertical turbine pumps up to 300 horsepower and four backup generators up to 1,500 kW. Additionally, Sukut constructed four concrete-lined reservoirs, installed electrical control devices, and performed other project-associated work.

CALL NOW