L-4 Pump Station Relocation, Phase II Project

Client:

Coachella Valley Water District


Location:

La Quinta, CA


Description of Project:

Worked for Coachella Valley Water District, Sukut is relocated the L-4 Pump Station east from its previous location to a point on the north side of the All-American Canal, just west of Jefferson Street in the city of La Quinta, California. The new pump station contains a steel-framed control building, three 125 horsepower pumps, three 100 horsepower pumps, a 7,500-gallon surge tank with an air compressor, and a 5,000-gallon surge tank with an air compressor.

The prior L-4 pump station was then decommissioned and demolished once the new pump station became operational. Sukut also extended a 24-inch irrigation pipeline 1,300 lineal feet east toward the new pump station, along the north side of the canal.