Description of Project: 

Prime contractor Sukut Construction performing grading and demo operations in front of the ongoing erection of Reefer Racks – the red steel structures in the backdrop — inside an active Port of Los Angeles shipping terminal. The construction of this schedule oriented job will mark the completion of infrastructure for the first-ever automated terminal to be built on the West Coast.

Client: 
Port of Los Angeles
Total Value: 
39M
Date Completed: 
Wednesday, April 30, 2014
Location: 
Los Angeles, CA
Follow us on LinkedIn Follow us on Facebook Follow us on Instagram Follow us on Twitter Follow us on Google Plus Follow us on YouTube