Description of Project: 

Sukut constructed four, 70-acre waste water treatment ponds. This project was designed as a balanced site. When the on-site material was excavated and reused, there was a shrinkage factor of 35 percent. This would have created a need for import material but with the use of GPS on the Sukut equipment, we were able to facilitate the grades and compensate for the loss loss due to shrinkage and balance the site.
The following is brief description of work completed:
• Sukut performed all of the mechanical and electrical work in the pump station.
• Moved 1.9 million cubic yards of earth.
• Construction of four, 70-acre waste water treatment ponds holding more than 1 billion gallons.

Client: 
County Of Los Angeles Sanitation
Total Value: 
$42 Mil
Date Completed: 
Thursday, April 24, 2014
Location: 
Lancaster, CA