Description of Project: 

Sukut was awarded a $28.7 million Wastewater Reclamation Project, located in Yucca Valley, CA. The project is adjacent next to the existing Hi-Desert Water District project, also executed by Sukut. The scope consists of constructing over 32 miles of gravity sewer pipeline and 422 polymer manholes. The pipes will range in size from 6” to 21”, and vary in depth from 6’ to 25’. Construction of the system will include 4 jack and bore crossings through Caltrans Right of Way at Highway 62, and 1 jack and bore crossing across San Bernardino County Flood Control of Way. The work is scheduled to start in January of 2018 and be completed in the first quarter of 2019.

Client: 
Hi-Desert Water District
Total Value: 
28.7 million
Location: 
Yucca Valley, CA