Project Summary

Antelope Valley Landfill

Location: Palmdale
Total Value: $6.20M
Client: USA Waste of America

Description of Project:
Sukut moved 1,267 cy of dirt, installed 3,000 Linear feet of leachate collection piping and placed 41000 cy of cover soil screening.

Project Summary: Sukut moved 1,267 cy of dirt, installed 3,000 linear feet of leachate collection piping and placed 41000 cy of cover soil screening for the Antelope Valley Recycling and Disposal Facility.

Scope of Work & Percentage Self-Performed:
Sukut moved 1,267 cy of dirt, installed 3,000 linear feet of leachate collection piping and placed 41000 cy of cover soil screening

Innovation Employed:
  • On-site  excavation of  approx 1,267,000 cy
  • Size of the project is over 600,000 square feet of lined HDPE surface
  • Low perm soil mixing and placement of 46,000 cubic yards
  • 3,000 linear feet of leachate collection piping with sumps
  • 41,000 cubic yards of cover soil screening and placement
  • Over 11,950 linear feet of "V" ditch construction


Back